- 07/08/07
Installation of Boots on Upper Dish, Evaluate Synchro Problem
- 05/16/07
Presentation to Longmont Amateur Radio Club
- 05/06/07
Install bird "Guano Guard" on upper dish, Measure for future radome
- 04/15/07
Cable for elevation syncros, Painting, Box for upper dish motor controllers
- 04/01/07
Guest visits, Selsyn cables, Calibrate pointing offset of lower dish
- 03/25/07
Upper dish RF Characterization Measurements
- 03/24/07
CU Student Site Visit
- 03/11/07
Lower dish downconverter, lower dish manual, Prep for EOSS-115 balloon flt
- 02/04/07
Install hydroxyl line receiver on lower dish
- 02/04/07
Proposal for Mira observations
- 02/03/07
Site inspection, Snow
- 12/10/06
Synchros, Radio astronomy searches, Discuss upper dish calibration
- 12/03/06
Synchros, Cable to lower dish, Proposal for solar observing project
- 11/26/06
SpectraCyber temperature sensitivity, selsyns, SC data collection
- 11/14/06
Report of DSES missing gear
- 11/12/06
Mount SpectraCyber, OH searches, DSES eqmt tagged, Cables, Educational charts
- 11/05/06
Facilities repairs, Work on signal cable from lower dish
- 10/29/06
Work on signal cable to lower dish
- 10/15/06
Preparations for EOSS-113, Lower dish signal cable, Upper dish manual
- 10/08/06
Clean jack screws, Lubricate upper dish
- 09/17/06
Work on radio gear, Clean up facility
- 09/10/06
Lower dish tracking, Syncros, Servers, Data logger, both dishes moving together
- 08/27/06
Signal detection, SpectraCyber upgrade, New dual feed front end built
- 08/27/06
Joseph A. DiVerdi presentation at the Society of Amateur Scientists
- 08/20/06
Setup what is being called the 'Chinese Radio'
- 08/06/06
Selsyns, Install log detector for SMP project, Remount lower dish
elevation motor
- 07/16/06
Replace SMP feedhorn, RFP, Selsyns, Rebuild steps, Missing gear
- 07/16/06
Replace LNA on upper dish and characterize it
- 05/21/06
Progress on Lower Dish Work, cables, feed mounts, selsyns, boots
- 06/07/09
Trace out lower dish synchro controller wiring, Cleanup, Work on the CUE Project Plan
- 06/25/06
Characterization of the RF Systems on the Upper and Lower Dishes
- 06/04/06
Mount HI Horn on Lower Dish, Repair Upper Dish Brake, SMP data, Selsyns, ATV dipole
- 05/22/06
Progress on Lower Dish, Cables, Feed Mounts, Selsyns, Boots
- 05/20/06
Direction Controller Connection to PC, 426MHz antenna
- 03/25/06
Lower Dish Tracks Moon and Sun, DSES Restoration Efforts Continue
- 03/13/06
DSES Milestone: Lower Dish Tracks Moon
- 01/22/06
Anemometer and VLF radio operation restored, Work on signal recovery methods
- 01/15/06
Lab Cleanup, SMP Operation Begun, Morgie Down, Prepare Data Set
for Pulsar Detection
- 12/09/05 Progress on
Lower Dish, Breakers, Drive Motors, Power
- 11/19/05 Work on Lower Dish Power Wiring
- 11/12/05 EOSS-100 Tracking Report and Critical Review, Site Improvements, Unscheduled Meeting
- 11/06/05 New Motors and Motor Control Panel Emplaced in Lower Dish
- 10/16/05 Lower Dish Scaffold, Painting Control Panel
- 10/08/05 Visitors, Lower dish position control panel, GPS RX turned off,
CGI for SpectraCyber
- 10/02/05 Work on Lower
Dish Control Panel
- 10/02/05 Antenna controller, ICOM PCR-1000 test,
Prospective member, SpectraCyber controller
- 09/24/05 Changing Racks, Changing Servers, Power Outage
- 08/26/05 Testing of new absolute encoder on upper dish
- 08/19/05 Trouble shoot VLF, connect anemometer, on pulsar observations, SpectraCyber RX, NCLUG
- 08/01/05 DSES Represented at NASA Balloon Science Workshop
- 07/12/05 Deep Impact Tracking - Final Report
- 06/23/05 Horizon Data Computed for DSES Upper Dish
- 06/19/05 New Method of Analysis for Drift Scan Data
- 06/12/05 Feed Horn Work, Computer Configuration and Naming, Setup Data Logging
- 06/12/05 Scaffold Repair, Site Clean up, New Electrical Cabinet, Rodents, New Azimuth Motor
- 06/01/05 Activity Report, Dual Frequency Feed Horn Completed
- 05/28/05 Activity Report, Motors Removed, Paul Berge, Slate
- 01/04/05 Report on
Tracking of EOSS-90, University of Kentucky Big Blue
- 01/04/05 Report on
Soft Gamma-Ray burst detection; Hydrogen receiver calibrations using 3C033
- 12/26/04 Report on
radio astronomy and other work projects at T-22
- 11/13/04 Report on radio
astronomy work activities at T-22
- 10/11/04 First
full-up test of tracking an extra galactic radio source under computer control
- 10/10/04 First time
test of Paratrack controlling the upper dish, successfully tracked the Sun
and ISS
- 08/31/04 Report on work
activities at T-22
-
05/01/04 EOSS-76 Tracking Report, very successful recording of balloon video telemetry